New hybrid timber frame/double stud wall 3

Lots of activity on the job.  Framing is complete.  The interior air barrier (Intello) and service cavity are complete.  The entire house is off of the electric grid, so we're running all of our tools off of PV.  Dense-pack cellulose in the 12" double stud walls and 18" cathedral ceilings is complete.  And windows and doors are in.  While the sheetrock is being done, we'll be outside starting the south porch and west deck.